Construction
Excellence.

Planning, steering and delivering construction projects: driven by takt rather than by a schedule, from first concept to handover.

METHOD
Takt planning and takt control to VDI 2553
PHASES
Concept · Design · Execution · Handover
PROJECTS
Buildings · Civils · Infrastructure · Industrial plant
01 · SERVICES

Takt instead of schedule.

A conventional schedule says when something should be finished. It does not say whether work can proceed on site today. We steer through takt, commitments and constraints.

01

Takt planning and takt control

The method comes from manufacturing and has been proven in construction for years. Areas are cut into takt zones and the trades pass through them in a fixed sequence. More transparency, better coordination and daily performance management on site.

SCOPE
  • Takt planning per construction section
  • Takt control during execution
  • Pull control of the trades
  • Plan reliability metric
  • Constraint and disruption management
  • To VDI 2553
02

Last Planner System in execution

Planning is short-cycle and done by the people who execute. Weekly planning with the trades, binding commitments, consistent follow-up. Whoever makes the commitment is the one who has to keep it.

SCOPE
  • Weekly planning with the trades
  • Commitment tracking
  • Look-ahead and constraint removal
  • Daily site huddles
  • Material scheduling
  • Root-cause analysis on deviation
03

Design, users and simulation

The most expensive mistake is made in design and paid for on site. We bring users into the design process in a structured way, derive the room programme from the workflows, and test critical sequences before anything is built.

SCOPE
  • User coordination during design
  • Functional and operational planning
  • Process simulation alongside design
  • Mock-up rooms and prototypes
  • Interfaces between design disciplines
  • Training for the client organisation

We take on the steering of the workflows, not architectural or structural design under HOAI, and not site management in the sense of the German state building codes.

02 · PROJECT EXAMPLES

What we delivered.

Three extracts from practice, anonymised at the clients’ request.

On schedule
HOSPITAL

Complex hospital project with a large number of designers and trades. Takt-based planning from design into execution, costs held stable.

-20%
RETAIL · EXECUTION TIME

Rapid-build system for commercial buildings, developed with the client and rolled out nationwide. Standardised methods, consistent quality.

Forecast
INNOVATION · AI-SUPPORTED

Integration of AI algorithms into existing project management tools. Bottlenecks and risks surface earlier, the forecast gets sharper.

TRAINING

Lean Construction Academy

As a certified VDI training partner we qualify client, designer and user teams as Lean Construction experts to VDI 2553.

To the academy →
04 · CONTACT

Talk to us.

We look at your live project and tell you where the schedule has already been lost.