Construction Excellence

Our Construction Excellence framework delivers innovative approaches for project planning, project management and project execution — to deliver complex construction and infrastructure projects fast, smart and efficiently.

Construction infrastructure
BUILDING · INFRASTRUCTURE · PROCESS PLANTS
01 · FRAMEWORK

Construction Excellence Framework.

A field-tested set of methods we use to plan, steer and deliver construction projects — from the first concept phase through to handover on time.

Takt planning and takt control: the origin of a method.

More transparency, better coordination and higher productivity: the takt planning and takt control (TPS) method stands for daily performance management directly on site.

Read: the origin of takt planning →

Certification programme: VDI 2553 Lean Construction Expert.

A holistic view of design and execution improves the quality of buildings and prevents unnecessary resource consumption. Lean Construction adapts the lean management proven in automotive to construction. As a certified VDI training partner, we offer the qualification programme for the "Lean Construction Expert per VDI 2553".

VDI 2553 · certified
02 · INTERNATIONAL PRACTICE

International experts, international reference projects: building, civil engineering, infrastructure, process plants.

03 · PROJECT EXAMPLES

What we have delivered.

Three excerpts from our Construction Excellence practice, anonymised at the client's request.

CE.01 · HOSPITAL

Productivity in design and construction execution

Complex hospital project: many designers and trades to coordinate within a tight time and cost frame. Lean Group was involved from design through to execution and implemented a Construction Excellence framework tailored to the multi-layered nature of the project. With takt-based planning and optimised flows, productivity was lifted continuously through the design and construction phases.

SCHEDULE held
COST stable
PHASE DESIGN → BUILD
CE.02 · RETAIL

Fast-build system shortens execution time of commercial buildings

Optimisation of commercial buildings in retail: in close cooperation with the client, Lean Group developed a fast-build system and rolled it out across Germany after a successful concept phase. Standardised construction procedures secured consistent high quality and enabled more environmentally friendly methods.

EXECUTION TIME −20%
ROLLOUT NATIONWIDE
QUALITY standardised
CE.03 · INNOVATION

AI-driven optimisation of construction progress and forecasting

Innovation project: using AI to optimise construction progress and improve forecast accuracy. Integration of AI algorithms into existing project-management tools for sharper analysis, earlier identification of bottlenecks and risks, and higher transparency along the project.

FORECAST sharper
RISK visible earlier
TRANSPARENCY lifted